DLC Outdoor Building Projector LED Flood Light Arm Knuckle 1/2 NTSM U YOKE Brack

DLC Outdoor Building Projector LED Flood Light Arm Knuckle 1/2 NTSM U YOKE Brack

Model No.︰LL-FLU-30-150W

Brand Name︰Lowcled

Country of Origin︰China

Unit Price︰US $ 15 / pc

Minimum Order︰5 pc

Inquire Now

Product Description

Features:

Model LL-FLU-(120W-150W) LL-FLU-(60W-100W) LL-FLU-(30W-50W)
Power 120W / 150W 60W / 70W / 80W /100W 30W / 40W / 50W
lumen/w 140lm/w 140lm/w Total lumen
Total lumen 16800lm /21000lm 8400lm /9800lm/11200/14000lm 4200lm/5600lm/7000lm
Size(mm) 285*235*89 223*197*65 156*142*57
LED Chips SMD2835
Driver Sosen/Lifud/Meanwell/factory driver
Dimmable NO (0-10v dimmable option)
Functions to Choose hiden/inside Photo sensor And anti-water -anti foggy Breather
Input Voltage 100-277VAC /100-347V/ 347V/ 480V
Beam angle 60*120 degree
CRI RA>70 or 80
CCT 3000k/4000k/5000k/5700k/6500k
PF >0.95
THD <15%
Frequency 50/60Hz
Warranty 5-7 YEARS WARRANTY & 50000hrs span life

 

Advantage:

  • Use imported brand LEDs,no UV,IR or other radiation,no hazardous metal;
  • No pollution to human body or environment.
  • Raw materials used are strictly complied with ROHS;
  • Energy saving,long life,excellent color rendering;
  • International standard base,easy to mount,replacement for traditional lights;
  • Widely used in indoor lighting of household,market,showcase,stage,museum etc.

 

Application:

1. Tunnel, Subway, Underground Lighting;

2. Gymnasium, Sports Stadium Lighting;

3.Building, Billboard Lighting;

4.Gas Station, Garage Lighting;

5. Park, Garden Lighting;

6. Workshop, Factory Lighting;

7.Warehouse, Storage Lighting;

8. Yard, Square Lighting;

9.Road,Highway Lighting;

10.Station,Dock Lighting etc

11. Directly replace the traditional HID light to save energy

 

Trade terms:

  •  Payment terms: T/T,L/C at sight
  • Sample Delivery Term: Samples can be delivered within oneweek via DHL/Fedex/UPS/TNT/EMS
  • Shipping port: Shenzhen, China

Price Terms︰ EXW Shenzhen factory

Payment Terms︰ T/T or LC at sight

Lead Time︰ 7-10days after receiving payment

Product Image